Ordering Timeline - Factory/Production/Delivery
#11
AudiWorld Junior Member
Thread Starter
Join Date: Jan 2016
Posts: 19
Likes: 0
Received 0 Likes
on
0 Posts
Just received an update from our dealer.
"Your car went into the order bank on 12/29. It is currently scheduled to be built the week of 4/25/16, which would put the delivery at late May / early June."
He then went on to say how the orders are pulled in they order they are received into the bank.
Does this appear to be a dealer allocation issue, or am I getting fed a line of bull...?
"Your car went into the order bank on 12/29. It is currently scheduled to be built the week of 4/25/16, which would put the delivery at late May / early June."
He then went on to say how the orders are pulled in they order they are received into the bank.
Does this appear to be a dealer allocation issue, or am I getting fed a line of bull...?
#12
Just received an update from our dealer.
"Your car went into the order bank on 12/29. It is currently scheduled to be built the week of 4/25/16, which would put the delivery at late May / early June."
He then went on to say how the orders are pulled in they order they are received into the bank.
Does this appear to be a dealer allocation issue, or am I getting fed a line of bull...?
"Your car went into the order bank on 12/29. It is currently scheduled to be built the week of 4/25/16, which would put the delivery at late May / early June."
He then went on to say how the orders are pulled in they order they are received into the bank.
Does this appear to be a dealer allocation issue, or am I getting fed a line of bull...?
The 5 month delay in order and build appears excessive. The dealer probably just threw it in an order bin and did not assign the order to an allocated build slot.
My dealer had told me that Audi is collecting all "sold" orders and building them preferentially at the earliest possible.
Unless your dealer already had 20-30 sold orders or is a very small dealer with low no. of assigned build spots, the delay in build seems long to me.
There are so many persons on this forum with a lot more knowledge and you may get better insight from them.
(My build of 8th week of 2016 was locked to any further changes on 1/29/16.)
Last edited by pagla6; 02-15-2016 at 02:13 PM.
#13
AudiWorld Member
Join Date: Nov 2002
Location: Florida
Posts: 569
Likes: 0
Received 0 Likes
on
0 Posts
Generally, the dealer takes one of their allocated, changeable build in Audi Dealer System and changes the specs to your order. That's what transpired in my case.
The 5 month delay in order and build appears excessive. The dealer probably just threw it in an order bin and did not assign the order to an allocated build slot.
My dealer had told me that Audi is collecting all "sold" orders and building them preferentially at the earliest possible.
Unless your dealer already had 20-30 sold orders or is a very small dealer with low no. of assigned build spots, the delay in build seems long to me.
There are so many persons on this forum with a lot more knowledge and you may get better insight from them.
(My build of 8th week of 2016 was locked to any further changes on 1/29/16.)
The 5 month delay in order and build appears excessive. The dealer probably just threw it in an order bin and did not assign the order to an allocated build slot.
My dealer had told me that Audi is collecting all "sold" orders and building them preferentially at the earliest possible.
Unless your dealer already had 20-30 sold orders or is a very small dealer with low no. of assigned build spots, the delay in build seems long to me.
There are so many persons on this forum with a lot more knowledge and you may get better insight from them.
(My build of 8th week of 2016 was locked to any further changes on 1/29/16.)
#14
Mine is due to be built week 8 and I don't need it until May if you can get Audi to swap.lol
Seriously I was told Mid May when I placed my order but I ve had 2 approaches to take the car at the end of March. I must confess mine has only to cross The North Sea and not The Atlantic Ocean. As I am in Florida for 6 weeks commencing Aril I don't want the car sat in an Airport carpark eating into my warranty. Especially as my wife has told me it will be my last car. She has told me this when I got my last 5 cars. lol.
Seriously I was told Mid May when I placed my order but I ve had 2 approaches to take the car at the end of March. I must confess mine has only to cross The North Sea and not The Atlantic Ocean. As I am in Florida for 6 weeks commencing Aril I don't want the car sat in an Airport carpark eating into my warranty. Especially as my wife has told me it will be my last car. She has told me this when I got my last 5 cars. lol.
#18
AudiWorld Member
Join Date: Feb 2016
Location: N. Cal
Posts: 154
Likes: 0
Received 0 Likes
on
0 Posts
I put in my order with my dealer around 2/10. The factory accepted on 2/14.
Build date is week 12, week of 3/21
I should have my q7 by the end of April or early May.
Much faster than anticipated.
Build date is week 12, week of 3/21
I should have my q7 by the end of April or early May.
Much faster than anticipated.
#19
AudiWorld Member
Join Date: Nov 2002
Location: Florida
Posts: 569
Likes: 0
Received 0 Likes
on
0 Posts
Received this email today from my dealer:
"Today much more than anticipation is being built. Your Audi Q7 has gone into production. You’ve reached an important milestone, and delivery of your Q7 is getting closer. I’ll contact you again when your vehicle is in transit to the European port of Emden. From there, your Q7 will start its journey to the United States.
While you’re waiting, you can read about legendary Audi fit and finish, which has become the modern standard.
If you have any questions about your Q7 as it's being produced, please feel free to contact me at any time."
We were scheduled for 8th week of 2016, so looks like they may be running ahead of schedule!
"Today much more than anticipation is being built. Your Audi Q7 has gone into production. You’ve reached an important milestone, and delivery of your Q7 is getting closer. I’ll contact you again when your vehicle is in transit to the European port of Emden. From there, your Q7 will start its journey to the United States.
While you’re waiting, you can read about legendary Audi fit and finish, which has become the modern standard.
If you have any questions about your Q7 as it's being produced, please feel free to contact me at any time."
We were scheduled for 8th week of 2016, so looks like they may be running ahead of schedule!
#20
Received from dealer
Audi Q7
Exterior
L5L5 - Florett Silver metallic
Interior
UX - Pistachio Beige
Required Options
Factory Options
4X4 - Rear side airbags, 6W9 - DELETE Front License Plate Holder, 9WQ - RSE preparation (for Audi RSE system), PAW - Cold Weather package, PCU - Driver Assistance package, PSS - Adaptive chassis package, WPT - Prestige package
Port Installed Accessories
ACG - Audi Connect Guide, LER - Rear Load Edge Protection Film, QWL - Audi Guard Wheel Lock Kit
Production Week
0816
Production Complete
02/23/2016
Ship Departure
03/02/2016
Domestic Port Arrived
03/18/2016
So no delays on Air suspension cars!
Can someone smart figure out the name of the ship leaving Emden 3/2/16 with ETA Jacksonville, FL 3/18/16?
Thanks!
PS: VIN provided with this update, so it apparently gets assigned at production as it was unavailable on 02/22/16; Production Completed
02/23/2016
Audi Q7
Exterior
L5L5 - Florett Silver metallic
Interior
UX - Pistachio Beige
Required Options
Factory Options
4X4 - Rear side airbags, 6W9 - DELETE Front License Plate Holder, 9WQ - RSE preparation (for Audi RSE system), PAW - Cold Weather package, PCU - Driver Assistance package, PSS - Adaptive chassis package, WPT - Prestige package
Port Installed Accessories
ACG - Audi Connect Guide, LER - Rear Load Edge Protection Film, QWL - Audi Guard Wheel Lock Kit
Production Week
0816
Production Complete
02/23/2016
Ship Departure
03/02/2016
Domestic Port Arrived
03/18/2016
So no delays on Air suspension cars!
Can someone smart figure out the name of the ship leaving Emden 3/2/16 with ETA Jacksonville, FL 3/18/16?
Thanks!
PS: VIN provided with this update, so it apparently gets assigned at production as it was unavailable on 02/22/16; Production Completed
02/23/2016
Last edited by pagla6; 02-24-2016 at 02:23 PM.