Test




Then I pulled the floor up yesterday and said what the hell am I doing?
We himmed and hawwed about it for about an hour and decided to make a really nice bathroom....going to have a killer shower.
I am taking everything up including the subfloor and putting down a sub floor from Warmboard, which is a 1 1/4" plywood with channels for PEX tubing for radiant floor heat. Removing the radiator. Each of the pieces of sub floor have an aluminum top on them to conduct the heat.
I will upgrade the water plumbing to copper also.
Here is the subflooring that I will get:
<img src="http://www.warmboard.com/images/presspage_large.jpg">
Here is the old bathroom:
<img src="http://www.audipages.com/house/sm_DSC00417.JPG">
<img src="http://www.audipages.com/house/sm_DSC00418.JPG">
<img src="http://www.audipages.com/house/sm_DSC00419.JPG">
<img src="http://www.audipages.com/house/sm_DSC00420.JPG">
<img src="http://www.audipages.com/house/sm_DSC00421.JPG">
Here is the nasty *** closet which is behind the door, it has about 10 coats of paint on it....
<img src="http://www.audipages.com/house/sm_DSC00423.JPG">
<img src="http://www.audipages.com/house/sm_DSC00424.JPG">
Here is the point that I said what the hell am I doing, I want to get rid of that radiator and put in radiant floor heat....
<img src="http://www.audipages.com/house/sm_DSC00426.JPG">
And here's how I left it yesterday.....have to get a dumpster now....
<img src="http://www.audipages.com/house/sm_DSC00429.JPG">
<img src="http://www.audipages.com/house/sm_DSC00430.JPG">
<img src="http://www.audipages.com/house/sm_DSC00432.JPG">
We figure we won't go to Aspen over Halloween and save at least $1K and put it into the bath. Want to get this done ASAP.



