Weekly builder update
The slab is done
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_004.jpg">
What I thought was a drain turned out to be just a sewer access pipe, I guess in case of blockage. The layout of the garage is visible
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_005.jpg">
View from the back
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_010.jpg">
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_004.jpg">
What I thought was a drain turned out to be just a sewer access pipe, I guess in case of blockage. The layout of the garage is visible
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_005.jpg">
View from the back
<img src="http://tomasz.data2net.org/gallery-albums/newhouse/newhouse_010.jpg">
#6
Start sketching out your garage layout :-) We can pimp out the garage while they are building...
Epoxy, lighting, cabinets, and a place for spillage mats for when Rob comes over :-)
Trending Topics
#10
there's a floor plan on my website if you wanna have a go at designing the garage space
it's not a huge garage by any means, there is going to be some storage on the side, might be good for bikes and air compressor. Also, I've elected to leave the downstairs bathroom unfinished and use it as tool storage/shop area.