FB: slow progress
The intake manifold has been cleaned, primered and painted in the same black as the engine block.
I labeled all of my hardware and bagged components with their respective hardware.
I installed and torqued my spark plugs to 28Nm.
I placed the PES manifold on the exhaust studs but I neglected to order the washers... so I was not able to torque the manifold down.
I installed my oil pump drive gear and the distributor block off plug.
I've got a lot of hardware on order,
Remaining in stage 2
Front flange requires final fittment (I'm going to replace the seal again out of compulsion)
IM shaft flange requires final fittment *same reason*
Crank gear needs to be torqued to spec
dipstick tube needs to be installed.
Stage 3... partly completed
Head Gasket <done>
Cylinder head <done>
Head Bolts <done>
Valve cover <coated but has not come in yet>
spark plugs <done>
Cam Gear <requires torquing to spec>
Hall sender ring <requires torquing to spec>
Hall sender <requires torquing to spec>
TB Roller
TB Tensioner
Timing Belt
Acc bracket <undergoing cleaning>
Acc bracket hardware <on order>
Water pump
Water pump hardware
Vane pump <pac?>
Alternator <pac?>
Block brackets <awaiting hardware>
Oil filter bracket <undergoing cleaning>
Oil cooler <ready>
Oil cooler hardware <on hand>
Timing Covers <on hand>
On my return home I had to jump start the Saab convertible which hasn't been driven in some time. We really should have a battery tender on that car.